Line down? Flag it urgent and it goes to the top of the queue. Flag it urgent

Memory and GPUs are short. We find them anyway.

DDR5, DDR4, enterprise SSDs and RTX-class GPUs are on allocation, and prices move every week. Send the spec and quantity. We come back with stock confirmed at the source and a price we hold for 48 hours.

Approximate street price of a 64 GB DDR5 kit, rising from about $170 in early 2025 to about $500 by October 2026 $550$250$100 Jan 2025Jan 2026Oct 2026 ChipShark quote Confirmed stock, price held 48h
Approximate 64 GB DDR5 kit street price. Based on public reporting (TweakTown, OverClock3D); not a live feed.

What's short right now

Our read of the categories buyers ask us for most. Updated monthly.

CategoryStatusChannel todayHow we source it
DDR5 memoryRDIMM, UDIMM, SO-DIMMShortageAllocated, price up weeklyAuthorized and vetted independent stock, lot photos before you pay
DDR4 memoryLegacy servers and workstationsShortageProduction winding downOEM excess and decommissioned-server pulls, with the seller's test report
Enterprise SSDsNVMe U.2 / M.2, SATATightLong lead on high capacityMatched on endurance (DWPD) and firmware, not just capacity
New GPUsRTX 50-series, RTX Pro workstationShortageAbove list price, thin stockNew in box, serial checked against the distributor invoice
Used 24 GB GPUsRTX 3090 / 4090 for local AITightGrey market, high fake riskSeller burn-in proof and serial match before we buy

Our read as of October 2026. Verify before committing a build.

What waiting costs you

A stalled build has a daily cost. Put in yours and compare waiting for the channel against sourcing now.

Wait for the channel$0
Source through ChipShark$0

Difference: $0 in delay cost.

Your own estimate. Our lead time is confirmed on the quote.

How a shortage order works

You pay after you approve the quote and before we buy. In a market that moves weekly, that's what lets us hold your price.

Send spec and quantity

Exact part numbers if you have them, otherwise the spec. Tell us what substitutes are acceptable.

Get confirmed stock and a held price

Source tier, lot photos and a price held for 48 hours. Nothing is bought until you approve.

Pay, and it ships to you

We buy the stock and it ships direct to your dock with the paperwork. Our refund policy applies.

Request stock

You get a line-by-line quote by email. Urgent requests go to the top of the queue.

Request sent.

We'll reply to the email you gave with stock and a held price. Need it faster? Email [email protected].

Questions

Why do I pay before you buy?

Shortage stock sells within days and prices change weekly. Paying on approval lets us lock the lot at the quoted price. If a part is confirmed counterfeit, you get a full refund within 10 business days of our confirmation, with return shipping covered.

How do you avoid fakes in a shortage?

Shortages pull counterfeits into the market. We disclose the supplier tier, get lot and date-code photos before you pay, serial-check GPUs, and can route a sample through a third-party lab at your cost.

What if the price moves after the quote?

Quotes are held for 48 hours. After that we re-check stock and price before you pay, and tell you if either changed.

Do you ship to India and the Middle East?

Yes. We source in North America and Europe first, and pick the closest reliable one to your drop-off to keep transit and duty down.